ARCHIVED - Regulation of Operations and Maintenance Activities on Pipelines Under the National Energy Board Act and Guidance Notes - Figure 1: NEB-Regulated Facility Filings

This page has been archived on the Web

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

12 July 2005

Format Table
What is the proposed activity or physical project?
Down Arrow
Down Arrow
Construction of a new pipeline >40 km
Down Arrow
s. 52 of NEB Act
Down Arrow
Down Arrow
  • Upgrades which result in increases to MOP[1], the diameter of the pipe and/or permanent increases in airborne emissions or noise levels, above previously approved levels;
  • Looping;
  • Construction of a new pipeline <40 km;
  • Addition and installation of a new connection for the receipt of, or sale of, oil or gas, including a tie-in and associated line piping up to 60 m in length, metering and regulating facilities; or
  • Addition and installation of compressors or pumps and associated
Down Arrow
s. 58 of NEB Act[2] / s. 58 Streamlining Order
Down Arrow
Down Arrow
  • Activity required to safely operate an existing pipeline; or
  • Maintenance activities, upgrades, repairs or replacements to an existing pipeline or part of a pipeline that do not increase the MOP or diameter of the pipeline.
Down Arrow
"Operations & maintenance activities on NEB-regulated pipelines: requirements & guidance"
Down Arrow
Deviation of an existing pipeline
Down Arrow
s. 45 of NEB Act
Down Arrow
Down Arrow
Variance to Certificate or Order
Down Arrow
s. 21(2) of NEB Act
Down Arrow
Down Arrow
Change in ownership
Down Arrow
s. 74(1)
(a)-(c) of NEB Act
Down Arrow
Down Arrow
Change in service (When no new facilities are required)
Down Arrow
s. 43 Onshore Pipeline Regulations (OPR)
Down Arrow
Down Arrow
Deactivation[3], reactivation[3] , or decommissioning[3] of existing pipeline
Down Arrow
s. 44 of OPR; s. 42/43 of Processing Plant Regulations (PPR)
Down Arrow
Guide G,
Guide H
& Guide I
Filing Manual
Down Arrow
Abandonment[4]
Down Arrow
s. 74(1)(d) NEB Act; s. 50 OPR
Down Arrow

[1] MOP = Maximum operating pressure
[2] If an Order pursuant to s.58 of the NEB Act is granted, a Company is exempted from the requirement of having to obtain a Certificate under s. 52 of the NEB Act. If a s. 58 exemption Order is not granted, a Company will need to apply for a s. 52 Certificate.
[3] Definitions for deactivation & reactivation are provided in the OPR & PPR. Proposed definition of decommissioning pending.
[4] Definition of abandonment provided in OPR & PPR.