Briefing Note
Overview and Economics of
Horseshoe Canyon Coalbed
Methane Development
May 2007
Copyright/Permission to Reproduce
This briefing note, Overview and Economics of Horseshoe Canyon Coalbed Methane Developments, is the first in a new series of reports that will provide information on energy topics of interest to Canadians. It includes information on the development of coalbed methane in central Alberta from a geological formation called the Horseshoe Canyon. Commercial production from this unconventional gas resource was achieved in 2002. The information and analysis in this document provides a "snapshot-in-time view" that will be subject to changes in technology or market conditions for both price and costs.
The National Energy Board (NEB) is an independent federal agency that regulates parts of Canada's energy industry. Its purpose is to promote safety and security, environmental protection and economic efficiency in the Canadian public interest within the mandate set by Parliament in the regulation of pipelines, energy development and trade.
The NEB regulates the construction and operation of pipelines that cross international or provincial borders, as well as tolls and tariffs of those pipelines. International power lines are also regulated by the NEB, as well as some oil and gas exploration on frontier lands, particularly in Canada's North and certain offshore areas. The import and export of natural gas and the export of oil, natural gas liquids and electricity also comes under the NEB's jurisdiction.
In addition to its regulatory work, the NEB also collects and analyses information about Canadian energy markets and produces publications, reports and briefing notes based on this analysis.
Those wishing to rely on information from this briefing note in any regulatory proceeding before the NEB may submit the document, just as it may submit any public document. Under these circumstances, the submitting party in effect adopts the material and may be required to answer questions pertaining to the material.
Coalbed methane (CBM) is natural gas contained in coal seams. It is primarily composed of methane, with variable amounts of nitrogen and carbon dioxide. Various other acronyms have been applied to CBM including coalbed gas (CBG, used in B.C.), coal seam gas (CSG, used in Australia) and natural gas in coal (NGC, which was created for use in Canada but has not been widely accepted). During formation of coal, organic material from plants and trees becomes coalified by the effects of heat, pressure and geologic time. During the process, large amounts of methane are generated and the majority of the methane is adsorbed (bonded) onto the surface area of the coal while smaller amounts are contained as free gas within the fracture system (called cleats) of the coal.
CBM is considered to be an unconventional gas because: it is both a source rock and a reservoir rock; of how the gas is stored; and, the manner in which the gas is produced. Coals generate and contain the gas internally, conventional reservoirs host gas sourced from other formations that migrate to the reservoir. The majority of gas in coal is bonded to the surface of the coal; gas in conventional reservoirs is contained in the free space (porosity) of the rock (see figure 1). Coal is a very efficient storage mechanism for gas, with coal capable of storing six to seven times more gas per unit volume of rock than conventional reservoirs. CBM is produced by reducing pressure to very low values to initiate production, and CBM production flow rates tend to be relatively low. In contrast, conventional reservoirs generally produce at higher rates and pressures and would be considered to be depleted, and the wells abandoned, at the low pressures of CBM production.
Figure 1 - CBM Process (wet-type)
(Source: Trident Exploration Corporation, modified by NEB
Canada's first CBM development started in 2002, in the Horseshoe Canyon Formation (HSC), and did not encounter any water. Most of the HSC CBM play consists of dry coal. These wells produce gas immediately, reach a peak production rate quickly and then begin a slow decline. Due to its short development history, the long term production profile for the HSC has yet to be determined. The production life of a CBM well can be very long (as much as 50 years is projected), but rates and pressures remain low throughout that time. Due to the low production pressures, compression is required to increase the pressure of the gas up to pipeline specifications.
Other potential CBM plays in Canada include the shallow Tertiary or Cretaceous Ardley coals in the Scollard Formation, located in west-central Alberta. This coal often contains fresh-water and as a result, has not been extensively tested to date. The Lower Cretaceous Mannville Formation contains thick seams of coal which contain salt water. Some commercial development has occurred in Alberta and the Board is closely monitoring developments. In British Columbia, the Lower Cretaceous Gates Formation has been tested in the northeast part of the province (contains salt water), the Jurassic Kootenay coals have been tested in the southeast part of the province (contains fresh water) and there is testing of the coals near Princeton in southern B.C. None of these projects have been confirmed as commercial. In Nova Scotia, the coals in the Stellarton and Cumberland Basins are also being tested, they contain brackish waters.
This briefing note will describe the geology of HSC coals; development history including issues related to development; regulatory requirement; economics of CBM development; and, future trends. CBM currently represents 3.7 per cent of Canadian gas production, up from virtually zero in 2002, with more than 85 per cent of that coming from the HSC.
Key Message:
HSC coals tend to consist of several individual coal seams each less than 5m thick. One well would normally contact several of these coal seams for a total coal thickness of up to 30m. The prospective play area of HSC coal varies from as shallow as 200m in local areas to more than 1000m, along the western margin of the play area. HSC coals are interbedded with sand zones. The sands often contain conventional natural gas (which may have been sourced from the adjacent coalbeds). Production of the conventional gas found in these sands, along with the gas from the coal seams, results in a increased initial production rate for the well. The amount of production from the HSC play that is actually coming from conventional sands is still unknown. However, various estimates have been made by the companies involved and from outside observers that range from 10 to 40 per cent. As opposed to CBM development in the U.S., the HSC coals contain little to no internal water. As a result, there is no need to dewater the formation and gas production occurs very quickly with the production rate maximizing within a few months.
The lack of formation water is thought to be related to the under-pressuring of the sediments in this region, such that the entire sediment package is charged by gas. The regional under pressuring may also be related to the melting of the continental glaciers of the last ice age and the subsequent rebound of the earth following removal of the weight of that ice.
The HSC Formation is found in the Upper part of the Cretaceous section (see figure 2). HSC coals are of relatively low rank in the sub-bituminous C to high volatile bituminous B range. Coal rank refers to the level of maturation of the coal. These coals tend to have low gas contents (but are fully saturated with methane), poorly-developed cleating, low permeability, and are under pressured. Permeability is the key to successful operations as it controls the rate that the gas can flow to the well-bore. Average permeability in the HSC coals ranges from less than 5 milliDarcy (mD) to more than 40mD, and may be related to reservoir depth. Much of the early development focused on areas with higher permeability. Those were areas where the coals are warped over deeper geological structures such as Devonian reefs or significant sub-crop edges within the HSC play area. More recently, development has expanded laterally as companies better understand how to exploit the available permeability.
Figure 2 - Schematic Cross-Section Western Canada Sedimentary
Basin and Enhanced Table of Formations
(Source: Alberta Geological Survey)
Key Messages:
The presence of the HSC coals was well-known long before its CBM development. HSC coals were extensively mined in the Drumheller region where the coals are exposed at the surface through the wind and water erosion affiliated with the Red Deer River Valley and creation of the Alberta Badlands. The subsurface extent was confirmed by conventional oil and gas drilling that has taken place since the 1950s. Those wells targeted both the conventional sands in the Edmonton Group and the deeper Mississippian and Devonian formations thus adding to the knowledge of the entire Cretaceous sediment package.
In the United States, CBM production has been occurring since the 1970s. All developments to date have been from wet formations. Typically, a large contiguous land block was required for CBM development where coals have to be dewatered prior to gas production. CBM production in some areas, especially the Powder River Basin in Wyoming, caused problems for landowners, government bodies and environmental groups. The major concerns had to do with the rapid development of the resources, large volumes of produced water and some chemical reactions between the produced water and surface soils.
Initially, the HSC coals were not thought to be prospective for CBM due to their relatively shallow depth, low permeability, low gas contents and thin individual coal seams. Development of similar low quality coals in the Powder River Basin in Wyoming in the late 1990s provided incentive for companies in Canada to have a closer look at the HSC coals. The first programs were located near Calgary (see figure 3). Vertical wells were utilized due to the relatively shallow depths and the total thickness of the formation. However, companies found that drilling several wells in an area provided economies of scale in all facets of the development scheme.
Some experimentation was necessary in the early wells to identify successful techniques to adopt and unsuccessful techniques to avoid. It was found that drilling with coiled tubing in an underbalanced (mud weights less than hydrostatic pressure) scheme followed by multiple induced fracturing using nitrogen as the fluid, with little to no proppant (sand or beads used to keep the fracture open), provided the most cost-effective results (see figure 4). Coal has a higher affinity for adsorption of nitrogen molecules over methane molecules, thus the injection of nitrogen has an added benefit in releasing methane from the coals. Induced fractures are oriented in a northwest–southeast direction, parallel to the mountain front in the west, as that direction is perpendicular to the primary fractures or cleats in the coals. This exposes more of the cleats to the well bore. Four wells per section is deemed to be optimal for development, although there is some variation depending on the local geology in the coals.
Figure 3 - Location map of early Horseshoe Canyon projects
(Source: NEB)
Figure 4 - Typical Horseshoe Canyo nitrogen completion using coiled tubing
(Source: CSUG)
The HSC deposit is generally quite shallow with average well depth being about 700m deep (see figure 5). Shallowest wells are on the east side of the deposit and deeper wells are generally on the west side. The deeper wells shown in the graph are usually drilled for a deeper conventional target and have been re-completed up-hole in the HSC for the CBM.
Resource Estimates
Federal and provincial government studies and industry studies on the size of the resource were initiated shortly after development started in the HSC. However, they were and remain, hampered by the limited information available at this early stage of resource development. For the HSC coals, MGV, now Quicksilver, estimated 70 Tcf gas-in-place[1] in 2002. The Alberta Geological Survey (AGS) completed a study in 2004 outlining the entire region of the HSC play area and determining that it contained 66 Tcf GIP. The Canadian Gas Potential Committee (CGPC) estimated that there was 139 Tcf GIP in 2001 but reduced that to 54 Tcf GIP in 2005. How much is recoverable? Again, there is limited information available at this early stage of resource development. MGV estimated 13-23 Tcf in 2002, CGPC estimated 9 to 12 Tcf in 2005, Trident estimated 6 to 11 Tcf in the main development fairway in 2005. Canadian Energy Research Institute (CERI) and Canadian Society for Unconventional Gas (CSUG) published a report in late 2006 that indicated the HSC coals contained up to 36 Tcf of gas-in-place, with 30 Tcf developable and 10-12 Tcf recoverable (see figure 6). As development proceeds, additional information will become available to improve estimates of the recoverable volume.
[1] Gas in place or GIP refers to the volume of gas in the ground.
Figure 5 - Range of depths for HSC wells
(Source: NEB)
Figure 6 - Horseshoe Canyon Gas-In-Place Map showing Developable Area
(Source: CERI/CSUG)
Regulatory Requirements
CBM is subject to the same EUB drilling, production, and operational rules and regulations as conventional natural gas. Alberta Energy also treats CBM as natural gas for royalty and tenure purposes[2]. Regulations cover water handling for both saline and non-saline water, air emissions for both flaring and venting, compression and noise levels, land access, well data requirements, public consultation requirements, royalty rates and the land tenure system. Please see the Energy and Utilities Board's Web site www.ercb.ca for a list of the regulations.
[2] For more information go to:
ERCB's EnerFAQs
Alberta Department of Energy
List of directives covering CBM development
Aquifer protection is a key issue for residents and landowners in the development area. Every oil and gas well passes through several groundwater aquifers. Well casing is cemented in place to protect groundwater aquifers prior to drilling into deeper formations. Under Directive 056, effective May 1, 2006, CBM developers must test all active water wells, either flowing or equipped with a pump, and all observation wells in the provincial Groundwater Observation Network within a minimum 600m radius of a proposed CBM well. Testing must be done prior to drilling a new CBM well or re-completing an existing well for CBM production where the completions will be at a depth above the Base of Groundwater Protection (BGWP). If no water wells are found within the 600m radius, testing must be conducted at the nearest water well within a 600 to 800m radius. Nearby land owners can also request testing of their water wells.
Key Messages:
The level of future HSC CBM development will be mainly determined by economics. The key factors impacting HSC CBM economics are:
In this assessment, data relating to the above factors has been input into a model to determine three commonly used economic indicators:
Each of the main data inputs feeding into the economic model are discussed below.
Average Well Productivity
Large scale commercial development since 2003 has resulted in annual HSC CBM connections numbering approximately 500 in 2003, 1,500 in 2004, and 2,500 in 2005. This large number of connections provides a good basis for estimation of initial production characteristics for the average HSC CBM well. Due to the limited duration of the production history for this play, parameters that define the average well productivity over the longer term are more difficult to assess. As per the recent EMA "Short-term Canadian Natural Gas Deliverability 2006-2008", the NEB's current assessment of HSC average well productivity in 2007 is defined by the following parameters:
Initial Well Productivity: 77 mcf/d
1st Decline Rate: 5 per cent per year
2nd Decline Rate: 15 per cent per year
Months to 2nd Decline: 16
3rd Decline Rate: 10 per cent per year
Months to 3rd Decline: 60
The above parameters establish the “Base Case” of well productivity in this economic assessment. A second case of well productivity was also created, with initial productivity set at 65 mcf/d, a reduction of 15 per cent from the base case. This second case provides some insight on the economic impact of a lower average initial well productivity. Lower average initial well productivities can be expected as the HSC CBM development progresses.
Costs
From discussions with CBM producers and certain published reports, the NEB has an estimate of the costs associated with HSC CBM development. The base case costs chosen for this economic assessment, in 2007 Canadian dollars, are as follows:
Well is Dry and Abandoned:
Probability: 5
per cent
Dry Hole Cost*: $150,000
per well
* Note: includes $8,000 per well for water well testing requirements.
Well is Successful:
Probability: 95
per cent
Drill, Case & Complete*: $300,000
per well
Tie-in Cost: $150,000
per well
Abandonment: $21,000
per well
Land Cost: $15,000 per well
2007 Operating Costs**:
Custom Processing Cost: $0.85
per mcf
Fixed Well Operating Cost: $700
per well per month
Variable Well Operating Cost: $0.20 per mcf
** Note: In the economic model, Future Operating Costs are obtained by applying an annual inflation factor of two per cent to the 2007 Operating Costs.
The above numbers were obtained recently from active CBM producers in the Horseshoe Canyon play and are believed to be good estimates of average development costs. The above numbers represent the base case cost scenario in this economic assessment.
Cost Escalation
Escalating costs have become a major factor impacting resource development in general in the Western Canada Sedimentary Basin in recent years. Significant cost escalation has occurred since 2003, predominantly a period of high rig utilization levels and an increasingly tight labour market. Discussions with CBM producers indicate that cost inflation has been in the range of 15 per cent per year over the past three years or so.
Since the last quarter of 2006 a general slowdown in drilling activity in the WCSB has occurred, resulting in lower rig utilization. The slackening pace of drilling activity may exert some downward pressure on development costs and perhaps a return the levels of cost inflation that prevailed prior to 2003, around three per cent. Nevertheless, the impact of higher capital costs has been assessed in this economic evaluation. Two cases with higher capital costs (drilling, tie-in and land) have been run to provide insight into the impact of higher development costs; a case where capital costs were increased by 15 per cent from the base case, and a case where the capital costs were increased by 30 per cent from the base case.
In all cases, an inflation factor of two per cent per year was applied to operating costs subsequent to 2007.
Gas Price
Gas prices can be very volatile. Since January 2006, the AECO C[3] monthly average gas price has been as high as 12.05 $C/GJ (Jan. 2006) and as low as 4.49 $C/GJ (Oct. 2006). In this economic evaluation, the AECO C gas price (in 2007 $C) was varied between 4.00 $C/GJ and 12.00 $C/GJ for each case of well productivity and development cost. To obtain gas price in future years, an inflation factor of two per cent per year was applied.
[3] AECO C is a natural gas trading hub in Alberta, which is the major pricing point for Western Canada Sedimentary Basin natural gas. It is representative of intra-Alberta pricing; that is, the wholesale price of the gas for both sellers and buyers.
Fiscal Regime- Royalties and Taxes
The economic model applies the following regarding royalties and taxes:
Results of Economic Assessment
The two tables shown below present the economic indicators resulting from the various scenarios of initial well productivity, capital costs, and gas price. The first table is in reference to the NEB's current estimate of average well initial productivity for 2007. The second table presents economic indicators calculated on the basis of a lower average well initial productivity (65 mcf/d). The part of the first table highlighted in yellow shows the economic indicators for the base case under the various price scenarios.
Case: Initial Well Productivity = 77 mcf/d
| BASE CASE: Current Cap Costs |
Current Cap Costs Increased by 15% | Current Cap Costs Increased by 30% | |||||||
| AECO C, $C/GJ | IRR, % | NPV (disc @ 12%) | Payout, Years | IRR, % | NPV (disc @ 12%) | Payout, Years | IRR, % | NPV (disc @ 12%) | Payout, Years |
| $4.00 | 0.11% | -$163,064 | 16.29 | -2.11% | -$222,126 | Never | -4.97% | -$285,128 | Never |
| $5.00 | 7.54% | -$65,063 | 7.97 | 4.80% | -$118,456 | 9.75 | 2.76% | -$173,788 | 12.06 |
| $6.00 | 13.71% | $25,758 | 5.68 | 10.55% | -$25,044 | 6.73 | 8.06% | -$76,928 | 7.89 |
| $7.00 | 19.46% | $113,649 | 4.47 | 15.66% | $64,139 | 5.23 | 12.72% | $14,259 | 6.04 |
| $8.00 | 25.31% | $201,765 | 3.72 | 20.65% | $152,296 | 4.31 | 17.14% | $102,827 | 4.94 |
| $9.00 | 31.42% | $289,841 | 3.20 | 25.75% | $240,355 | 3.68 | 21.55% | $190,904 | 4.20 |
| $10.00 | 37.89% | $378,169 | 2.80 | 31.06% | $328,588 | 3.23 | 26.08% | $279,146 | 3.65 |
| $11.00 | 44.50% | $465,612 | 2.49 | 36.64% | $416,844 | 2.87 | 30.78% | $367,276 | 3.25 |
| $12.00 | 51.28% | $552,495 | 2.27 | 42.43% | $504,732 | 2.58 | 35.69% | $455,553 | 2.93 |
Case: Initial Well Productivity = 65 mcf/d,
| Current Cap Costs | Current Cap Costs Increased by 15% | Current Cap Costs Increased by 30% | |||||||
| AECO C, $C/GJ | IRR, % | NPV (disc @ 12%) | Payout, Years | IRR, % | NPV (disc @ 12%) | Payout, Years | IRR, % | NPV (disc @ 12%) | Payout, Years |
| $4.00 | -4.70% | -$212,904 | Never | - | - | - | - | - | - |
| $5.00 | 3.45% | -$120,463 | 10.82 | 1.03% | -$176,754 | 14.40 | -0.96% | -$235,029 | Never |
| $6.00 | 9.22% | -$40,566 | 7.27 | 6.49% | -$92,867 | 8.66 | 4.25% | -$147,243 | 10.46 |
| $7.00 | 14.40% | $36,083 | 5.49 | 11.15% | -$14,532 | 6.49 | 8.61% | -$66,240 | 7.60 |
| $8.00 | 19.30% | $110,823 | 4.49 | 15.49% | $61,182 | 5.26 | 12.56% | $11,116 | 6.08 |
| $9.00 | 24.27% | $185,768 | 3.84 | 19.74% | $136,168 | 4.44 | 16.33% | $86,568 | 5.10 |
| $10.00 | 29.40% | $260,620 | 3.34 | 24.05% | $211,037 | 3.87 | 20.08% | $161,455 | 4.40 |
| $11.00 | 34.79% | $335,609 | 2.97 | 28.49% | $285,931 | 3.42 | 23.89% | $236,365 | 3.90 |
| $12.00 | 40.46% | $410,673 | 2.67 | 33.12% | $360,914 | 3.08 | 27.81% | $311,286 | 3.48 |
Companies apply a minimum IRR level to their own activities. For the purpose of this report, the NEB assumes an IRR or hurdle rate of 15 per cent is required. Projects that do not meet the hurdle rate are usually not pursued, and those that do meet the hurdle rate are in competition with other projects for the company's available capital. In the Base Case (Current Capital Costs and 2007 well productivity) the hurdle rate is achieved at an AECO C price of just over 6 $C/GJ. All of the other scenarios are more pessimistic than the Base Case in terms of well productivity and/or capital costs, and the IRR calculated for these cases at various price levels (see figure 7).
Using the Base Case as the measure, this analysis indicates that HSC CBM is marginally economic for companies to pursue at the AECO C gas prices in the range of 6 to 7 $C/GJ, which is around the price range seen over the past few months. These marginal economics and concerns about further cost escalation are likely key factors behind the slowdown in CBM drilling activity that has occurred in Alberta since the last quarter of 2006. At AECO C prices below 6 $C/GJ the economics for HSC development are poor on average and even more severe drilling curtailments would likely occur under this price scenario.
Figure 7 - IRR data from the above tables graphically
Cost escalation has been very high in recent years in the WCSB. The recent drop in drilling activity has left many rigs idle, changing the landscape with regard to escalating development costs. It is likely that development costs in 2007 will be a slightly lower than those in 2006. Nevertheless, the impact of escalating costs on IRR has been calculated and is shown graphically in Figure 7.
Key Messages:
Development
The CERI/CSUG November 2006 report included a map of the HSC play showing the GIP content of the HSC and made a decision to expect development only in areas where the GIP was greater than 0.5 Bcf/section (see figure 8). The NEB has defined a smaller area where most HSC development will occur using the following criteria:
The NEB refers to this area as the HSC Main Play Area. Figure 8 shows the geographic extent of this area compared to the “Developable Area” defined in the CERI/CSUG report of November 2006. Figure 8 also shows the CBM wells drilled to date in the vicinity of the HSC Main Play Area, categorized as HSC Main Play and Other CBM. Mannville CBM wells are not shown on the map.
CBM plays are very sensitive to gas prices. As long as there is sufficient revenue to justify the expenses of development with a reasonable rate of return for the company, development will go ahead. This can be achieved by having a sufficiently high gas price or by using technological developments to reduce costs in all area of development or by some combination of the two.
An example of cost cutting in the development stage for HSC CBM is “built-for-purpose” rigs. Industry has built special coiled tubing rigs that are smaller and more mobile than conventional rigs. These coiled tubing rigs can drill a well to about 900m in as little as 12 hours, without the need for wide roads or expensive pad preparation in advance of drilling. There are 40 of these rigs now available and in total; they can drill in excess of 3,000 wells annually. One drilling company has responded to this challenge and has modified its conventional rigs to be more mobile to compete with the coiled tubing rigs. Conventional rigs have the advantage of using drill pipe that can last for many wells versus use of a string of coiled tubing that only lasts about a month and costs $60,000.
Figure 8 - Horseshoe Canyon Main Play Area and CBM Wells
Development is still in its early stages (six years) and HSC wells are expected to produce for 40 to 50 years. Until some longer term production history is available, there will be uncertainty associated with the total amount of the resource to be recovered. Within the next five years there should be sufficient information available to support a better estimate of the recoverable resources of the HSC.
The level of HSC CBM development is directly proportional to the activity of shallow rigs operating inside the HSC Main Play Area. For the purposes of this report, shallow rigs are those with depth capacity between 800 m and 2000 m. In the past three years (2004–2006), approximately 95 per cent of all HSC CBM wells have been drilled by shallow rigs. Shallow rigs working within the HSC Main Play Area over the past three years were engaged in drilling for HSC CBM about 83 per cent of the time.
Figure 9 - Active Rig Count For Shallow Rigs in HSC Main Play Area and Annual HSC Wells
Figure 9 shows the weekly and average annual active rig count for these shallow rigs operating in the HSC Main Play Area (left axis) and the annual number of HSC wells drilled (right axis). The strong correlation between shallow rig activity in the HSC Main Play Area and the level of HSC development is evident on this chart.
Several factors have acted to constrain HSC drilling activity in 2006, and these factors are expected to continue to influence the pace of development for the next several years. Marginal economics, resulting from the recent gas price environment and rising development costs, have been the biggest factor constraining HSC development since mid-2006. Many producers scaled back their drilling programs in response to the economics resulting in the decreased level of HSC drilling activity seen in 2006.
Other factors include some land-owner resistance to development in the Calgary-Edmonton corridor, and also that development of the easiest and most attractive acreage tends to occur first, with the remaining undeveloped acreage being more difficult and less attractive. The most attractive acreage exists in situations of higher quality resource and large concentrated land holdings with undisputed title to CBM.
In 2007, price uncertainty and marginal economics are expected to continue to constrain HSC drilling activity. It is expected that Horseshoe Canyon CBM drilling activity in 2007 will be somewhat lower than what occurred in 2006.
While an increase in gas price will create a climate more conducive to development, it is not expected that such an occurrence will impact drilling plans for 2007. The drilling programs for 2007 have been established and price swings one way or the other are not likely to significantly impact these plans. Higher gas prices over the longer term will positively impact HSC development, but the drilling constraints discussed previously will serve to limit the pace of the development over the longer term. Thus the drilling expectations over the longer term are estimated to be in the range of 2,000 wells per year - significantly less aggressive than earlier expectations.
Horseshoe Canyon Annual Wells Drilled
| Year | Number of Wells |
| 2003 | 590 |
| 2004 | 1824 |
| 2005 | 3046 |
| 2006 | 2089 |
Source: NEB Analysis of GeoScout well data as of March 28, 2007
Production
Horseshoe Canyon gas production has grown rapidly with the commercial development that has occurred since 2003, as shown in Figure 10. Future deliverability from this resource will largely depend on the rate of development - that is the drilling activity directed towards Horseshoe Canyon CBM. Figure 10 shows a projection of Horseshoe deliverability with a development level of approximately 2,000 wells per year in 2007 and 2008. Under this scenario Horseshoe Canyon gas production is expected to increase from 540 MMcf/d at the start of 2007 to approximately 750 MMcf/d at the end of 2008.
Figure 10 - HSC CBM Production History and Deliverability Projection
Key Messages:
Activity
Production
Key aspect of the development of Horseshoe Canyon CBM resources in Alberta include:
Resource and performance
Industry Activity
Economics
Alberta Energy and Utilities Board, Web site, www.ercb.ab , various reports
Alberta Geological Survey, Web site www.ags.gov.ab, various reports, last update March 2005
Canadian Energy Research Institute and the Canadian Society for Unconventional Gas, Socio-Economic Impact of Horseshoe Canyon Coalbed Methane Development in Alberta, November 2006
Canadian Gas Potential Committee, Natural Gas Potential in Canada 2001
Canadian Gas Potential Committee, Natural Gas Potential in Canada 2005
Canadian Society for Unconventional Gas, Web site www.csug.ca , various presentations
Sproule and Associates, Fundamentals of Coalbed Methane, Course Notes, March 2000
The CBM/NGC Multi-stakeholder Advisory Committee, Final Report on Coalbed Methane/Natural Gas in Coal, January 2006
The Freeholder Owners Association, Newsletter, November 4, 2006
Trident Exploration Web site, www.tridentexploration.ca, various reports