Please note, selecting a language will open a new window that contains the NEB hearing broadcast (javascript options will need to be enabled for this). The hearing proceeding will only be accessible using Microsoft Media Player. If you do not have this product on your machine, you may download a free copy of Microsoft Media Player.
| Application | Date | Time | Location | Broadcast |
|---|---|---|---|---|
| Imperial Oil Resources Ventures Limited Application for construction and operation of the Mackenzie Gas Pipeline (GH-1-2004) |
Starting 29 March 2010 | 1:00 p.m. to 6:00 p.m. daily* (or later as required) |
Northern United Place, 5403 - 50 Avenue, Yellowknife | To be determined |
| Imperial Oil Resources Ventures Limited Application for construction and operation of the Mackenzie Gas Pipeline (GH-1-2004) |
Monday, 12 April 2010 until Saturday, 17 April 2010 (as required) |
1:00 p.m. to 6:00 p.m. daily* (or later as required) |
Explorer Hotel, Yellowknife | To be determined |
| Imperial Oil Resources Ventures Limited Application for construction and operation of the Mackenzie Gas Pipeline (GH-1-2004) |
Tuesday, 20 April 2010 to Saturday, 24 April 2010 (as required) |
1:00 p.m. to 6:00 p.m. daily* (or later as required) |
Midnight Sun Recreation Complex, Inuvik | To be determined |
| Westcoast Energy Inc. 2009-08-04 - Application for the Fort Nelson North Processing Facility (GH-1-2010) [Folder 565873] |
Tuesday, 20 April 2010 | 9:00 a.m.* | To be determined | To be determined> |
| Enbridge Pipelines Inc. 2009-12-16 Application for Line 9 Final Tolls for years 2008, 2009 and 2010 (RH-1-2010) [Folder 587229] |
Tuesday, 21 September 2010 | To be determined | To be determined | To be determined |
| * Local time | ||||
There is no information session at this time.