Inspection Officer Order

Number Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
Description
JJD-1-2012 2012-07-11 Montreal Pipe Line Ltd. Pumping Station, St. Césaire (QC) Release of hydrovac slurry
JJD-2-2012 2012-10-05 Vantage Pipeline Vantage Pipeline Project Unauthorized construction activities
JJD-3-2012 2013-01-11 Vantage Pipeline Vantage Pipeline Kangaroo Rat areas 1 & 5 Work taking place in contradiction of conditions of original Certificate
MJS-003-2012 2013-04-15 City of Boucherville Montreal PipeLines Limited (MPLL) pipeline, Boucherville (QC) Improper contractor oversight
MJS-004-2012 2013-01-15 Les Entreprises Nord-Construction Montreal PipeLines Limited (MPLL) pipeline, Boucherville (QC) Unauthorized activities on pipeline right-of-way 
TS-01-2012 2013-02-19 Westcoast Energy Ltd (Spectra Energy Transmission Ltd) Pine River Gas Plant, Hasler Flats (BC) Uncontained disposal of hydrovac waste
KAR-001-2013 2013-05-30 BC Hydro Trans Mountain ULC and Westcoast Energy Inc. / Spectra Energy Transmission pipelines (BC) Unauthorized activities
KAR-002-2013 2013-05-06 Rokstad Power Corp. Trans Mountain pipeline (BC) Unauthorized activities
KF-001-2013 2013-11-19 NOVA Gas Transmission North Central Corridor (AB) Pipeline rupture / restriction on Return to Service
KF-002-2013 2013-12-10 NOVA Gas Transmission Flat Lake Lateral Loop (AB) Pipeline rupture / restriction on Return to Service
LMR-001-2013 2013-01-22 Vantage Pipeline Spread B (SK) Inadequate buffers/ vehicle crossings for watercourse
NNM-001-2013 2013-10-18 Vantage Pipeline Spread D (SK) Inadequate implementation of the construction inspection program
SR-001-2013 2013-04-18 Canadian Natural Resources The Knappen Border Pipeline and Associated Facilities owned by DR Four Beat Energy Corp. Does not meet pipeline regulations
DWL-001-2014 2014-08-28 Enbridge Pipelines Inc. Line 3 Replacement Project, Cromer (MB) Failure to comply with a term or condition of any certificate, license, permit, leave or exemption granted under the NEB Act
KAR-001-2014 2015-05-20 Landowner Canada Unauthorized excavation activity
KAR-002-2014 2014-11-26 Landowner Canada Unauthorized excavation activity
KF-001-2014 2014-10-03 NOVA Gas Transmission Limited Buffalo Creek West Resricted pressure increase
DRA-1-2015 2015-11-25 NOVA Gas Transmission Ltd. 460118.18E, 6355403.14N Non-compliance with Project Environmental Protection Plan
RCT-1-2015 2015-11-30 Westcoast Energy Inc. (Spectra Energy Transmission) British Columbia INC2015-138 – Release of a toxic substance (amine) at the Pine River Gas Plant
RRW-001-2015 2015-12-09 Westcoast Energy Inc. (Spectra Energy Transmission) Kobes Creek Booster Station (BC) Inability to demonstrate that the overhead cranes are safe to operate.
SCB-001-2015 2015-05-21 Westcoast Energy Inc. (Spectra Energy Transmission) Fort Nelson Gas Plant (BC) Inability to demonstrate that there are a sufficient number of qualified workers to safely conduct operations
GC-001-2016 2016-11-23 TransCanada PipeLines Limited Kingston Meter Station (ON) Wall thickness value for blasting the pipe
SLM-001-2017   2017-08-24 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Access bridges, Riparian Management Areas, sediment and erosion control
SLM-002-2017 2017-08-27 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Bridges, watercourses
RRW-001-2017 2017-09-13 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Pipe handling, hauling and stringing
RRW-002-2017 2017-09-29 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Pipe handling, hauling and stringing
TC-001-2018 2018-07-13 Centra Transmission Holdings Tribes Rock Replacement Project, Ontario Project design and construction not following OPR and CSA
JFB-001-2018 2018-08-22 Westcoast Energy Inc. (Spectra Energy Transmission) High Pine Expansion Project (BC) Sediment and erosion control issues at watercourses
AML-001-2018 2018-08-26 Enbridge Pipelines Inc. Line 3 Replacement Program Inability to demonstrate appropriate buffers are in place for wetlands
NB-001-2018
(Amendment No. 2)
2018-12-10 Westcoast Energy Inc. Prince George (BC) Overpressure protection system of the NPS 36” Line 2 set as required

Pressure reduction of the NPS 30” Mainline and NPS 36” loop

Amendment No. 2 issued to modify Restricted Operating Pressure and timeline for implementation of overpressure protection
AML-002-2018 2018-12-02 NOVA Gas Transmission Limited North Montney Project, Chetwynd, BC Environmental activities
MMO-001-2018 2018-12-02 NOVA Gas Transmission Limited North Montney Project, Chetwynd, BC Wetlands mitigation activities

 

Date modified: